From installation to reliable operation.
Installation incorporates equipment into the vessel and connects it with the required mechanical, electrical, automation and monitoring interfaces.
Commissioning verifies that these elements work together correctly and that the system is ready for normal operation.
Manta’s installation support can include plan review, technical supervision, progress inspection, deviation handling and acceptance testing. Commissioning can cover pre-commissioning checks, testing, troubleshooting, settings optimisation, start-up support and post-start-up assistance.
Installation Planning
Review requirements, responsibilities, interfaces, access and readiness before work begins.
Installation Support & Supervision
Provide technical guidance during positioning, alignment, connection and integration.
Pre-Commissioning Checks
Confirm that the installation is sufficiently complete and safe for functional testing.
System Commissioning
Test individual components, control functions, alarms, interlocks and operating sequences.
Start-Up Support
Support the transition from testing into normal system operation.
Handover & Documentation
Record system status, deviations, completed tests and relevant operational information.
Correct integration from the start
Early technical involvement reduces the risk of interface and installation errors.
Earlier identification of deviations
Issues can be documented and corrected before they affect handover or operation.
Verified system functionality
Testing confirms that components and control functions perform together as intended.
A smoother transition to operation
Crew and technical managers receive a clearer understanding of system status at handover.
Continuity into lifecycle support
The same organisation can continue with training, maintenance, troubleshooting and parts.
1. Define responsibilities and interfaces
We confirm the project scope, schedule, technical requirements and division of work.
2. Review installation readiness
Drawings, equipment, vessel interfaces, access and prerequisites are checked.
3. Support and inspect installation
Progress is followed and deviations are recorded and addressed.
4. Complete pre-commissioning checks
The installation is reviewed before systems are energised or operated.
5. Commission and test
Components, software, alarms, interlocks and operating sequences are verified.
6. Hand over the system
Results, outstanding items and relevant documentation are reviewed with the customer.