Inspection, maintenance, overhaul and repair during docking.

Dry docking provides a limited but valuable opportunity to complete maintenance that is difficult or impossible while a vessel is operating. Manta helps customers prepare, coordinate and execute technical work during the docking period. The objective is to enter the yard with a defined scope, the required parts and fewer technical surprises.
Request a quote

Service overview

Dry Dock Services bring inspections, engineering, maintenance, repair, parts and onboard execution together around the vessel’s docking schedule.

The purpose is not simply to perform work in the yard. It is to identify priorities early, prepare the technical scope and use the available maintenance window effectively.

For scrubber systems, Manta’s dry-dock scope can cover mechanical overhauls, tower care, automation and electrical work, piping repairs, safety-system testing and major-component repairs.  

What we do

Pre-Dry-Dock Inspection
Inspect the system in advance to identify wear, corrosion, damage and performance concerns.

Technical Scope Development
Convert inspection findings into defined work packages, specifications and priorities.

Parts & Kit Planning
Identify critical spares, repair kits, consumables and fabricated components before docking.

On-Site Execution
Provide engineers and specialists for inspection, maintenance, overhaul, repair and testing.

Shipyard Coordination
Coordinate technical interfaces, sequencing and responsibilities with the customer and yard.

Testing & Close-Out
Verify completed work and document the condition of the system before return to service.

What you gain

Fewer unexpected findings
Pre-inspection helps identify hidden wear before the vessel enters the yard.

Better use of the docking period
A defined scope, prepared parts and clear responsibilities reduce avoidable delays.

Lower missing-part risk
Required components can be sourced before the work begins.

Reduced emergency-repair exposure
Corrective work can be completed while equipment is already offline and accessible.

Improved long-term reliability
Overhauls, repairs and upgrades help prepare the system for the next operating cycle.

One coordinated service scope
Engineering, parts, workshop support and onboard execution can be combined within the same project.

Examples

  • Pumps, valves, NRVs, strainers and damper overhauls
  • Scrubber tower cleaning, measurement and repair
  • Lance, nozzle and demister maintenance
  • Overboard piping renewal and welding
  • CEMS, WMU and automation servicing
  • VFD and cabinet-cooling upgrades
  • Alarm verification and control-interlock testing
  • Compensator and spool-pipe replacement
  • Corrosion assessment and mitigation
  • Pre-planned supply of critical spares

Manta recommends completing a full-package pre-inspection several months before docking; its published approach identifies three to five months as an optimal preparation window. Where this is not possible, standardised dry-dock kits can support essential work.

How it’s done - Steps/Process

1. Begin with vessel and schedule information
We review the docking date, location, installed system and planned yard activities.

2. Perform a pre-docking inspection
Equipment condition and likely maintenance priorities are documented.

3. Develop the technical plan
We prepare the work scope, parts list, engineering requirements and responsibilities.

4. Prepare parts and resources
Components, kits, fabrication work and specialist personnel are coordinated.

5. Execute during docking
Work is completed in cooperation with the vessel, customer and shipyard.

6. Test and close out
System functions are checked and the completed scope, findings and recommendations are documented.

Contact us for more information

Preparing for an upcoming dry dock?

Contact us early with the docking schedule, vessel and system details, previous reports and expected maintenance scope.

Thank you

Thanks for reaching out. We will get back to you soon.
Oops! Something went wrong while submitting the form.

FAQ

When should planning begin?
Can you support a project without a pre-inspection?
Can you work together with the shipyard?